A number of such developers have made significant commitments to the Italian wind energy sector and estimate its potential growth far above the targets of the Italian government. The impact of every ocean energy project is monitored closely to ensure that it stays environmentally friendly. Numerous projects are located along the Atlantic and North Sea coasts of more about co-locating offshore technologies the UK, Ireland, France, Portugal, Spain, Belgium and the Netherlands.

In 2024, the 7Seas Med floating offshore wind project located off the coast of Sicily received a positive environmental impact assessment, representing a significant step forward for offshore wind development in Italy. Several large offshore wind initiatives, including the Adriatic Offshore Wind Project and the Puglia Offshore Wind Farm, have been proposed, reflecting potential future expansion in the sector. The project will focus on four pilot regions across the north, middle, and south Adriatic, where OWF systems will be modeled to optimize synergy with blue economy sectors and support green hydrogen production. By involving stakeholders from both countries in a quadruple helix model (involving government, academia, industry, and civil society), the project aims to develop OWF designs that prioritize ecosystem health alongside economic outputs. 1 – Sustainable growth in the blue economy SO 1.1 – Research and innovation

The Divento floating wind farms are carefully sited in areas with strong wind resources, away from sensitive marine habitats and migratory bird paths, preserving the natural beauty and biodiversity of coastal areas. Unlike many regions, including the North Sea, Italy’s coastal waters are predominantly deep, with depths greatly exceeding 50 meters. Based on the available information, the offshore wind farms under development are not only located in Italian territorial waters, but also beyond the 12 nautical miles. In parallel, Italy has a substantial offshore wind project pipeline under environmental review, amounting to more than 81,300 MW of potential offshore capacity, including megawatt-scale initiatives in the Sicilian Strait and Sardinia regions. Sardinia North West is planned outside the coast of Sardinia, where the waters are deep and the winds strong, making it a suitable location for floating offshore wind. In a country where floating offshore wind is still in its infancy but where renewable energy ambitions offer a great opportunity, with its deep-water coastlines, floating wind is, in many areas, the only offshore alternative.

This makes traditional fixed-bottom offshore wind farms impractical in locations with minimal environmental impact. There is no public pre-qualification procedure or tenders in general for operators of offshore wind farms in Italy in relation to obtaining authorisations and / or grid connection. This provides the framework for zones where Italian offshore wind farms can be built. Per the map below, this provides that states have (i) full sovereignty in their territorial seas; (ii) certain enforcement rights in a “Contiguous Zone”; (iii) certain specified sovereign rights in an “Exclusive Economic Zone”; and that (iv) the high seas and international seabed area fall outside of national jurisdiction. All this development/potential for Italian offshore wind begs the question; what is the legislative framework for building an offshore wind farm in Italy?

Given that Italy’s recent growth in wind power capacity has been about 30% annually, in 2008 the target appeared reachable by 2015. BEYOND proposes a novel approach that integrates marine ecosystem preservation with the development of multiple blue economy sectors. Traditionally, OWFs are designed solely for electricity generation, with little consideration for their impact on marine ecosystems. With offshore wind resources in specific Adriatic hotspots, the project seeks to analyse and identify optimal micro locations for OWF installation to harness renewable energy potential and drive green transition in Italy and Croatia.

The creation of jobs and infrastructure development provides a significant economic uplift to local communities, promoting regional development and stability. Well managed utility scale projects developed by strong and reliable partners enable Terna to plan and implement long term energy transmission infrastructure plans which support Italy’s energy transition objectives. The projects will necessitate the development of deep-water port facilities and other infrastructure improvements, which will have lasting benefits for Italy’s maritime industry and local economies. The floating offshore wind farms will provide a reliable and sustainable energy source, contributing to the stability and resilience of Italy’s electrical grid. These projects offer significant benefits across various domains, including economic growth, societal impact, and environmental sustainability.

This technology offers the potential to seed a new and innovative industrial sector, creating employment and export opportunities. In a report published in June 2024, the non-profit association WindEurope, after analysing the status of grid connections in several European countries including Italy, highlighted grid connection delays and current backlogs. The operator of the national transmission grid (Terna S.p.A.) and the operators of the local distribution grids (Terna S.p.A. and / or E-Distribuzione S.p.A.) must ensure renewable energy plants are connected. These main authorisations will be issued as part of a single authorisation procedure that will involve an investigation by relevant persons into the activities of the offshore wind farm.

Offshore renewables also has the potential to contribute to the SDG 14 on the conservation and sustainable use of oceans, coupling energy with blue economy activities like fishery, shipping, and tourism. The world’s oceans are a source of abundant renewable energy, which can be tapped through offshore wind (with fixed and floating foundations, or airborne), floating solar photovoltaics (PV) and other emerging ocean energy technologies. As of 2024, Italy’s offshore wind sector remains in its early stages, with about 13 MW of installed capacity and project pipelines under development following new auctions and policy support. Historical capacity figures show gradual growth in installed wind power since the early 2010s. The first foundations for the 30 MW Beleolico offshore wind farm were installed near Taranto in January 2022, and inaugurated in April 2022. Blue H Technologies of the Netherlands deployed the world’s first floating wind turbine, 21.3 kilometres (13.2 mi) off the coast of Apulia in December 2007.